The recent air core drilling at Odienne intersected gold mineralisation in a predominantly clay-weathered profile, with only limited information that could be inferred about the mineralisationâ€s style and key structural controls. The current diamond drill holes will represent the first drilling into fresh rock within the extensive anomalous corridor at the Odienne permit.
In addition to the diamond drill programme, over 5,500m of planned auger drilling is anticipated to increase the resolution of geology and surface geochemistry datasets and enhance the target vectoring of follow up drilling planned for the second half of the year. Three auger rigs with Sahara Geoservices have been mobilised, with extensive auger coverage initiated across an approximately 26km extent of gold-in-soil anomalism on two sub-parallel structural corridors. It is anticipated to be completed over the next four weeks.
Odienne Project
The Odienne Project, comprising two granted exploration permits, cover an aggregate 758km2 in the north- western region of Cote dâ€Ivoire. The permits are held under an earn-in agreement between Many Peaks†wholly owned Ivorian subsidiary and a local entity, under which Many Peaks has already earned into a 65% interest in the projects and holds the right to earn an 85% interest by sole funding exploration to feasibility study.
Extremist supporters of former president Donald Trump are lashing out online against Usha Vance, the wife of Trumpâ€s running mate, Sen. J.D. Vance (R-Ohio),...
Australia is home to a thriving tech sector with investment opportunities across a variety of subsectors. The tech sector contributed about AU$167 billion to...
Sister Stephanie Schmidt had a hunch about what her fellow nuns would discuss over dinner at their Erie, Pennsylvania, monastery on Wednesday night. The...