Brightstar Resources Limited (ASX: BTR) (Brightstar) is pleased to announce the first results from the large reverse circulation (RC) and diamond drilling (DD) program across the broader 1.45Moz Brightstar & Linden Gold (subject of an off-market takeover offer2) portfolio. This program is targeting gold mineralisation within delineated pit shells and underground designs outlined within Brightstarâ€
HIGHLIGHTS
The first results of gold assays from five holes have returned consistent +1g/t Au grades from RC drilling, part of the +30,000m drilling program1, targeting resource upgrades & extensions in conjunction with feasibility workstreams across Brightstarâ€
The RC program has commenced at Menzies, with the Link Zone drilling program now complete and drilling continuing across the Lady Shenton System. Link Zone is located ~1km south of the 287koz Lady Shenton deposit and ~1km north of the 43koz Lady Harriet System at the Menzies Gold Project (MGP).
Drilling at Link Zone was focused on small, discrete areas based upon A$3,000/oz Au optimised pit shells with information to be utilised to potentially upgrade mineralisation into the Measured & Indicated Mineral Resource Estimate (MRE) categories, ahead of further technical studies and a “Decision to Mine� towards potential development of a small-scale mining operation similar to the successful campaign completed at the Selkirk deposit which generated $13 million in profits5.
Brightstarâ€
The Link Zone deposits are a near surface opportunity with potential for strong economics given the shallow depth to mineralisation and favourable ore body geometry with immediate proximity to existing infrastructure. Following completion of the initial RC campaign at Menzies, the rigs will then mobilise to Brightstarâ€
With the success of the Selkirk Mining JV, which generated an excellent outcome earlier this year from the recovery of ~7,500 oz Au, we are looking forward to receiving the outstanding Link Zone assays and updating the resource confidence in the Link Zone MRE. This will be followed by further optimisation studies evaluating a potential small- scale mining campaign.
The RC rig has since moved to the Lady Shenton system, with infill drilling at Stirling & Pericles targeting resource confidence upgrades and metallurgical samples, to inform an updated MRE and potential upgraded mining inventories as part of the Pre-Feasibility workstreams presently underway�.
TECHNICAL DISCUSSION
30 drill holes were completed at Link Zone (Figures 1 & 2), with assays received so far for five holes and the remainder outstanding as detailed in Tables 1 & 2. All five reported holes (LZRC24001 – LZRC24005) were drilled in the central Merriyulah deposit, with one hole pending analysis and the remainder located at Westralian Menzies and Golden Dicks deposits. The completed holes at Link Zone were targeting both extensions to the mineralisation at shallow depths and infilling areas within the MRE to upgrade mineral resource classification to underpin mining studies.
Click here for the full ASX Release